← The 2027 National BudgetLaging Pasulong

DPWH Capital Outlay & Flood Control, 2016–2027

Capital outlay budget of the Department of Public Works and Highways, and the share of it going to flood control and drainage systems — the programs at the centre of the 2025 flood-control controversy. Enacted (GAA) figures for 2016–2026; proposed (NEP) for 2027.

Total DPWH capital outlay

View data table

† FY2027 shows the proposed NEP only; the FY2027 GAA has not been enacted, so its bar is textured and dashed.

Capital outlay only. Centrally-managed lump-sum MOOE appropriations for maintenance, repair and rehabilitation of flood control and drainage systems are excluded.

“Flood Management Services” was renamed Flood Management Program from 2018 onward.

2019 and 2025 totals are net of vetoed items (₱95.37B and ₱26.07B of DPWH capital outlay respectively); 2025 flood control is likewise net of vetoed Flood Management Program, SIPAG and BIP flood-mitigation projects.

Source: Various tables for DBCC (plenary 2027).xlsx — “DPWH CO and flood control” tab