Methodology
How these pages were made
Where the figures come from, how they were read and checked, how the President’s proposal was compared with the House bill, and how projects were placed in offices and districts. It also says where AI tools were used, and what these pages cannot tell you.
1. The documents
- The National Expenditure Program (NEP) for 2027, the President’s proposal, in four volumes published by the Department of Budget and Management (DBM).
- House Bill No. 10858, the 2027 General Appropriations Bill as the House passed it on third reading, in its printed volumes (the version for third reading, 8 October 2026). It is the bill as amended twice in plenary: first by substitution, with the amendments of the Budget Amendments Review Subcommittee (BARSC), then by individual amendments.
- Earlier budgets: the 2025 and 2026 General Appropriations Acts (GAAs), the 2026 NEP, and the Budget of Expenditures and Sources of Financing (BESF).
- The House record: the Budget Amendments Review Subcommittee (BARSC) hearing of 1–2 October 2026, its video and transcript.
- Reference lists:
- the Philippine Standard Geographic Code, for every region, province, town and barangay;
- COMELEC’s list of each town’s legislative district for the 2025 elections;
- DPWH’s own road, bridge and office-area records;
- DOH’s National Health Facility Registry;
- the House of Representatives’ list of members, copied on 27 October 2026.
Every 2027 figure is a proposal. The Senate and the bicameral conference can still change the bill, and the 2027 GAA has not been enacted.
2. Reading the figures
The House bill is a born-digital PDF: its text is exact. The NEP volumes are scanned pages carrying a text layer produced by optical character recognition (OCR) when the pages were scanned. We read that text layer as it is and rebuild each table from where the words sit on the page. No page was retyped, and no amount was re-read by a model.
Every table is checked against the document’s own printed totals. Examples:
- The 369 agency totals read from each document add up to the printed total of new appropriations, ₱4,494,082,001,000. The NEP side is off by ₱200,000, the one OCR misreading left in an agency total, and that row says so.
- All 2,340 headings in the House bill’s DPWH project list add up to their printed totals to the peso.
- The NEP’s lists of farm-to-market roads, health facilities and irrigation projects add up to their printed regional and grand totals.
Trust the amounts more than the names. In the NEP, amounts survive the scan well, but names often don’t: “Regiol” for Region I, “Camiquin” for Camiguin. Searching for a project by name can miss it, so check a line against the printed page before quoting it. The project and budget-line tables you can download give the page each row was read from.
3. Comparing the NEP and the House bill
Every agency
Each agency is compared at the finest level that adds up to its printed total on both sides: general administration, support to operations, each programme and each project total. Counted that way, the House moved at least ₱189.6 billion between 165 budget lines while keeping the total the same. It is a minimum: moves inside a programme cancel out, and 24 agencies could be compared only at their total.
DPWH, project by project
Each NEP project is matched to a House project, in order:
- the same name, once spacing and punctuation are set aside;
- a nearly identical name;
- a similar name with the same amount in the same office, but never when each name has a word the other lacks, such as a different barangay;
- for what is left, an AI classifier, accepted only when it is highly confident (see section 7).
What matches nothing is inserted by the House or not in the House bill. The House sometimes merges two projects or splits one, and that shows up as one dropped and one inserted. A few NEP projects with no confident match are shown as unresolved; they may be in the bill under a reworded name.
4. Placing projects in offices and districts
The bill files most infrastructure by agency, not by place. We place each project by what its label says:
- DPWH projects filed under a district engineering office go to that office.
- DPWH Central Office projects are placed by a bridge or road-section ID in DPWH’s own records, a road and kilometre post, coordinates in the label, or a town or barangay the label names.
- Farm-to-market roads, health facilities and irrigation projects are placed by the town or barangay they name. Hospitals are also placed through DOH’s facility registry.
Each method was tested before use, on projects whose answer is already known: for example, offices that serve a single district. Methods tested at 96.9% to 100% correct are used. Two methods that scored lower were dropped: points on DPWH’s district map (94.9%) and the start points of farm-to-market roads (58.8%).
Cities split into districts. In the 13 cities divided into districts by barangay (Manila, Quezon City, Caloocan and others), a town is not enough. There, a project is placed by the barangay, the district or a landmark its label names.
What cannot be placed is not guessed. Of the bill’s ₱641.3 billion in infrastructure:
| amount | share | |
|---|---|---|
| in a legislative district | ₱541.7B | 84.5% |
| at engineering-office level: the office is known, not which of its districts | ₱4.4B | 0.7% |
| local, but in no office area found | ₱19.5B | 3.0% |
| national or several areas: foreign-assisted, region-wide, nationwide | ₱57.8B | 9.0% |
| no place named: NIA’s irrigation programme list | ₱18.0B | 2.8% |
| the bill’s infrastructure | ₱641.3B |
So every district’s figure is a minimum. Each district page also lists projects that may be in the district but can’t be confirmed. They are shown by count and never added to the total.
Coordinates printed in the bill. Farm-to-market roads come with a start and an end point, and about one DPWH project in eight prints coordinates in its description. The coordinates map draws them as printed and checks each against the 2020 city and municipal boundaries (NAMRIA, PSA and OCHA Philippines, via geoBoundaries): is it on land, and in the town or engineering office the bill names? A point more than 25 km off, in the sea, made of placeholder digits, or copied from another project is marked an error. Where one common slip (a wrong whole degree, or degrees-minutes-seconds written as decimals) would put it in place, the page says so as a suggestion, not a finding. NEP coordinates flagged only in the NEP were checked on the scanned page.
5. Location is not proponent
The bill does not say who proposed a project or an amendment. A project in a district was not necessarily proposed by its representative. Other district representatives, party-list representatives, senators and the agencies themselves also propose projects. The district pages show where projects are, and the representative of that place. We invite proponents to disclose the projects they asked for.
6. Changes by district
The NEP and the House bill are each placed on their own, by the same methods, so a district’s NEP and House figures don’t depend on matching the two. The matching then says what kind of change each peso is: inserted, dropped, increased, reduced or unresolved. A check confirms that, for every district, the NEP figure plus the changes equals the House figure.
The districts gain more than the bill grows. Money placed in districts rose ₱98.2 billion, while the bill’s infrastructure grew ₱24.7 billion, because national and multi-area lines fell ₱73.4 billion.
7. Where AI tools were used
No amount on these pages came from an AI model. Every amount is read from the documents’ text and checked against their printed totals. AI was used in three bounded ways:
- Matching damaged names. For the NEP projects that ordinary matching could not pair, an AI classifier (TypeSafe’s Jev) chose among candidate House projects. Its pick was accepted only when it was at least 90% confident both of the pick and that the two were the same project; 44 matches passed. Every decision is kept on file.
- Reading office names off the page image. Where the scan destroyed an NEP office heading, a vision model (Google’s Gemini) read the heading from the page image. It read names only, never digits. It was checked against headings whose text survived (99.7% agreement), and a reading that contradicted the House bill was discarded.
- Writing. Anthropic’s Opus 5.5 AI model was used to write the code that reads and checks the documents, and to build and draft these pages. That is what “using AI tools” in each page’s footer refers to. The figures themselves are held to the checks in section 2.
8. The other dashboards
The fiscal, programme and oversight pages (debt and deficit, ayuda, MAIFIP, the Local Government Support Fund, and others) were built for the budget hearings, mostly before the House bill. They draw on:
- the tables prepared for the DBCC plenary;
- the NEPs and GAAs of each year;
- the Bureau of the Treasury;
- DBM’s and DILG’s project lists.
Each page names its own sources. Pages marked NEP show 2027 as the President proposed it.
9. Limits
- Proposals, not law. The figures will change in the Senate and the bicameral conference.
- Districts are those of the 2025 elections, and representatives are as listed by the House on 27 October 2026.
- Some projects can’t be placed.
- Many Manila projects name a street or zone rather than a barangay.
- Some NEP health facilities name no town.
- NIA’s ₱18.0 billion irrigation programme list names systems, not places.
- Health facilities count infrastructure only. Equipment and vehicles are shown separately and not added, and a facility funded only for them is listed but not counted as a project.
- One open discrepancy. The BARSC record’s change to the health facilities programme implies ₱6 billion more than the printed bill. These pages follow the printed bill.
10. Corrections
- 4 November 2026. The changes from the NEP now list DPWH projects the House kept under the NEP’s name but put in another barangay or town, or over another stretch of road (“relocated”, 47), or over another length (“rescoped”, 38). 48 of them keep the NEP’s exact amount, so a comparison of amounts had counted them unchanged. Each of the 123 candidates was read on the NEP’s page image; 25 were the scan’s misreadings and are not listed. See the changes page.
- 6 November 2026. A second pass placed more of the bill’s infrastructure in legislative districts, from ₱499.99 billion to ₱541.70 billion. No project already in a district moved to another. It reads each Central Office line with the regional heading the bill files it under, because DPWH’s kilometre posts repeat: Maharlika Highway K0192 is in both Nueva Ecija and Quezon. It also drops a province printed after a road’s name, matches bridges by name and road, reads barangays anywhere in a label, sections named for one town, barangays strung together in one town, and reads a town in a road’s name when the province is stated and the road stays in it. Each rule was tested on projects whose location is known. The “possibly in this district” lists now go by the road’s kilometre posts or the towns named where these narrow them down. 47 lines worth ₱5.76 billion were placed by hand on review, each with its evidence: most from the barangays and towns they name in the PSGC, some from official or press sources, and 14 Sampaloc streets from OpenStreetMap. Elsewhere in Manila that street table only narrows the “possibly” lists and counts nothing: it matched DPWH’s records on 94% of streets. Nine places are identified from outside sources and listed in the landmark file. ₱3.9 billion of programme lump sums and foreign-assisted projects moved from “local, not placed” to “national”. A line’s closing town now also decides its engineering office, not only its district: a drainage project in Catanauan, Quezon had been listed under a Bukidnon office. That was our error, not the bill’s. The coordinates page now lists place names the bill misprints or leaves incomplete, quoted as printed and not corrected.
- 6 November 2026. Project counts on the Locator, the district pages and the office pages had included DOH facilities funded only for equipment or vehicles, beside amounts that count infrastructure only. They no longer do: DOH health facilities in a district went from 440 to 216, and all projects in a district from 17,283 to 17,059. No amount changed, and no district's rank. The facilities are still listed.
- 4 November 2026. Where a project is, by legislative district: a DPWH line's own closing place ("…, Kadingilan, Bukidnon") now outranks the office it is filed under, its bridge ID and its coordinates. The bill files some projects under another province's office, and prints some copied coordinates and one wrong bridge ID (see the coordinates page). Before, a town named only in a road’s name could also decide the district. 108 projects changed district, 51 of them from “district not known”. Four Central Office projects the bill misspells (“Misamis Orienta”, “Bukldnon”) are now placed by hand, with reasons. The districts’ total rose from ₱497.63 billion to ₱499.99 billion. On the changes-from-the-NEP pages, the House side no longer borrows the NEP’s placement. Both pages now count the same House figure for every district.
- 4 November 2026. Debt, Deficit, and Pork adds the House bill on third reading as a 2027 column, and splits the seven pork-type programmes into hard pork (infrastructure) and soft pork (ayuda). The House bill raises them from ₱763.85 billion to ₱832.05 billion, 49.1% of the deficit; ₱53.41 billion of the ₱68.21 billion increase is soft pork. The NEP figures are unchanged. The version of 25 September 2026, used during the House deliberations, showed the NEP only.
- 3 November 2026. The House-bill pages were built from the version adopted by substitution (6 October), not the version for third reading (8 October). They now use the third-reading version. Its individual amendments restore five DPWH projects in Caloocan City’s 2nd district (₱134 million), taken from DPWH’s right-of-way payments; split ₱250 million of DOTr’s service contracting between expense classes and earmark it for electric passenger vessels; rename DOH’s MAIFIP the Medical Assistance Program; add a special provision on sitio electrification to NEA’s; and make PERA “at least” ₱2,000 a month. No agency’s total changed.
- 28 October 2026. Borrowed Pork and Debt, Deficit, and Pork had the 2025 figures for the health facilities programme and for medical assistance (MAIFIP) transposed. They now follow the 2025 GAA: ₱35.37 billion and ₱41.16 billion. The combined health figure the charts show was not affected.
- 28 October 2026. 2027 Budget: What the House Changed: the DOJ’s confidential-funds increase, ₱35 million, was confirmed on the printed pages of both documents.
To report an error, email the Office of ACT Teachers Rep. Antonio L. Tinio at [email protected].