Methodology

How these pages were made

Where the figures come from, how they were read and checked, how the President’s proposal was compared with the House bill, and how projects were placed in offices and districts. It also says where AI tools were used, and what these pages cannot tell you.

1. The documents

Every 2027 figure is a proposal. The Senate and the bicameral conference can still change the bill, and the 2027 GAA has not been enacted.

2. Reading the figures

The House bill is a born-digital PDF: its text is exact. The NEP volumes are scanned pages carrying a text layer produced by optical character recognition (OCR) when the pages were scanned. We read that text layer as it is and rebuild each table from where the words sit on the page. No page was retyped, and no amount was re-read by a model.

Every table is checked against the document’s own printed totals. Examples:

Trust the amounts more than the names. In the NEP, amounts survive the scan well, but names often don’t: “Regiol” for Region I, “Camiquin” for Camiguin. Searching for a project by name can miss it, so check a line against the printed page before quoting it. The project and budget-line tables you can download give the page each row was read from.

3. Comparing the NEP and the House bill

Every agency

Each agency is compared at the finest level that adds up to its printed total on both sides: general administration, support to operations, each programme and each project total. Counted that way, the House moved at least ₱189.6 billion between 165 budget lines while keeping the total the same. It is a minimum: moves inside a programme cancel out, and 24 agencies could be compared only at their total.

DPWH, project by project

Each NEP project is matched to a House project, in order:

  1. the same name, once spacing and punctuation are set aside;
  2. a nearly identical name;
  3. a similar name with the same amount in the same office, but never when each name has a word the other lacks, such as a different barangay;
  4. for what is left, an AI classifier, accepted only when it is highly confident (see section 7).

What matches nothing is inserted by the House or not in the House bill. The House sometimes merges two projects or splits one, and that shows up as one dropped and one inserted. A few NEP projects with no confident match are shown as unresolved; they may be in the bill under a reworded name.

4. Placing projects in offices and districts

The bill files most infrastructure by agency, not by place. We place each project by what its label says:

Each method was tested before use, on projects whose answer is already known: for example, offices that serve a single district. Methods tested at 96.9% to 100% correct are used. Two methods that scored lower were dropped: points on DPWH’s district map (94.9%) and the start points of farm-to-market roads (58.8%).

Cities split into districts. In the 13 cities divided into districts by barangay (Manila, Quezon City, Caloocan and others), a town is not enough. There, a project is placed by the barangay, the district or a landmark its label names.

What cannot be placed is not guessed. Of the bill’s ₱641.3 billion in infrastructure:

amountshare
in a legislative district₱541.7B84.5%
at engineering-office level: the office is known, not which of its districts₱4.4B0.7%
local, but in no office area found₱19.5B3.0%
national or several areas: foreign-assisted, region-wide, nationwide₱57.8B9.0%
no place named: NIA’s irrigation programme list₱18.0B2.8%
the bill’s infrastructure₱641.3B

So every district’s figure is a minimum. Each district page also lists projects that may be in the district but can’t be confirmed. They are shown by count and never added to the total.

Coordinates printed in the bill. Farm-to-market roads come with a start and an end point, and about one DPWH project in eight prints coordinates in its description. The coordinates map draws them as printed and checks each against the 2020 city and municipal boundaries (NAMRIA, PSA and OCHA Philippines, via geoBoundaries): is it on land, and in the town or engineering office the bill names? A point more than 25 km off, in the sea, made of placeholder digits, or copied from another project is marked an error. Where one common slip (a wrong whole degree, or degrees-minutes-seconds written as decimals) would put it in place, the page says so as a suggestion, not a finding. NEP coordinates flagged only in the NEP were checked on the scanned page.

5. Location is not proponent

The bill does not say who proposed a project or an amendment. A project in a district was not necessarily proposed by its representative. Other district representatives, party-list representatives, senators and the agencies themselves also propose projects. The district pages show where projects are, and the representative of that place. We invite proponents to disclose the projects they asked for.

6. Changes by district

The NEP and the House bill are each placed on their own, by the same methods, so a district’s NEP and House figures don’t depend on matching the two. The matching then says what kind of change each peso is: inserted, dropped, increased, reduced or unresolved. A check confirms that, for every district, the NEP figure plus the changes equals the House figure.

The districts gain more than the bill grows. Money placed in districts rose ₱98.2 billion, while the bill’s infrastructure grew ₱24.7 billion, because national and multi-area lines fell ₱73.4 billion.

7. Where AI tools were used

No amount on these pages came from an AI model. Every amount is read from the documents’ text and checked against their printed totals. AI was used in three bounded ways:

8. The other dashboards

The fiscal, programme and oversight pages (debt and deficit, ayuda, MAIFIP, the Local Government Support Fund, and others) were built for the budget hearings, mostly before the House bill. They draw on:

Each page names its own sources. Pages marked NEP show 2027 as the President proposed it.

9. Limits

10. Corrections

To report an error, email the Office of ACT Teachers Rep. Antonio L. Tinio at [email protected].