The House kept DPWH's budget almost level, and rewrote what it pays for
The President proposed ₱642.6 billion for the Department of Public Works and Highways in 2027. The House of Representatives passed ₱654.1 billion — a rise of ₱11.5 billion, or under 2%. The total barely moved; what the money pays for was rewritten. We compared the two budgets, the President's proposed National Expenditure Program (NEP) and House Bill No. 10858, line by line.
How much of the budget the House changed
| Measure | Amount | Share of DPWH |
|---|---|---|
| Total DPWH budget in the House bill | ₱654.1B | — |
| Change from the NEP (₱642.6B) | +₱11.5B | +1.8% |
| Moved from large loan-funded projects into local projects | ≈₱73B | ≈11% |
| All money that changed office (rises plus cuts) | ≈₱98B | ≈15% |
The first two rows say the department stayed almost the same size. The last two say how much of it was rewritten: roughly an eighth of DPWH's budget was taken from a few big foreign-assisted projects and spent instead on thousands of smaller local projects, most of them lodged with district engineering offices.
Where the money came from
Salaries were left unchanged. The change sits in infrastructure spending, and the largest cuts were to foreign-loan projects:
How the numbers fit together
The House added to some programme lines and cut others. The additions and the cuts are each far larger than the net change: they nearly cancel, leaving a ₱11.5B increase in the total DPWH budget.
| Change, House vs. NEP | ₱B |
|---|---|
| Additions | |
| BIP: multi-purpose buildings | +42.73 |
| BIP: access roads and bridges | +29.27 |
| All other additions (flood control, road upkeep, water supply and the rest) | +26.91 |
| Total additions | +98.91 |
| Cuts | |
| Laguna Lakeshore Road Network | −27.00 |
| Bataan–Cavite Interlink Bridge | −14.00 |
| Cebu–Mactan 4th Bridge | −6.00 |
| Pasig–Marikina River Channel | −5.50 |
| Davao City Bypass (two packages) | −5.50 |
| All other cuts | −29.42 |
| Total cuts | −87.42 |
| Net change in the DPWH budget | +11.49 |
So the ₱73B cut from foreign-assisted projects was recycled almost entirely into the Basic Infrastructure Program (+₱72.6B): a swap, not new money. The department's net ₱11.5B growth comes from the rest — chiefly road upkeep and the flood programme, less about ₱2.7B taken out of Support to Operations.
See every addition and cut, line by line →
District engineering offices gained ₱53.9B overall (₱129.6B to ₱183.6B): 158 offices gained, 20 lost, 20 were unchanged. The DPWH Central Office fell by ₱42.4B.
How many projects the House changed
The House bill lists 16,270 DPWH projects; the NEP proposed 11,303. By count the House's intervention is far larger than the money suggests — more than a third of the projects in the House bill are ones the proposal did not have.
| Outcome | Projects | Share |
|---|---|---|
| New in the House bill (no NEP match) | 6,212 | 38% of the House's list |
| Carried over unchanged | 9,669 | 59% |
| Carried over, amount changed | 389 | 2% |
| In the NEP, not found in the House bill | 1,010 | 9% of the NEP's list |
| Needs review (ambiguous) | 235 | — |
In all the House touched 7,611 projects — 6,212 new, 389 re-priced and 1,010 dropped. That is the opposite story from the money: the total rose under 2%, but the House rewrote more than a third of the project list, mostly by adding thousands of small local projects (median ₱10 million) in place of a few large loan-funded ones.
Thousands of new projects
- 5,134 new projects (₱67.8B) under district offices, typically ₱10 million each.
- 1,078 new projects (₱112.7B) under the Central Office, typically about ₱97 million each. By DPWH rule, projects of ₱50 million and above are lodged with the Central Office, and 925 of these are that size. Most name a specific town or road in the provinces, so they are largely local projects filed centrally because of their size.
- 1,010 projects (₱57.0B) in the NEP were not found in the House bill. Some may have been renamed, merged or split rather than removed.
- In total, 6,212 new projects, up to ₱180.5B.
Those 6,212 new projects are worth up to ₱180.5B, but that is not money added to the budget. The House also dropped ₱57.0B of NEP projects and cut ₱82.9B from projects it kept — mostly the loan-funded flagships (Laguna Lakeshore −₱27.0B, Bataan–Cavite −₱14.0B, Cebu–Mactan −₱6.0B). It largely swapped the project list: the net movement at project level is roughly +₱40B, and the department as a whole rose only ₱11.5B.
District offices with the largest increases
| District engineering office | Legislative district(s) | Proposed | House | Change |
|---|---|---|---|---|
| Ilocos Norte 1st | Ilocos Norte 1st | ₱0.41B | ₱4.79B | +₱4.38B |
| Davao de Oro 1st | Davao de Oro 2nd | ₱0.66B | ₱2.35B | +₱1.68B |
| Misamis Occidental 2nd | Misamis Occidental 2nd | ₱0.20B | ₱1.85B | +₱1.65B |
| South Cotabato 2nd | South Cotabato 2nd and 3rd | ₱0.50B | ₱2.08B | +₱1.58B |
| Isabela 4th | Isabela 4th and 6th | ₱1.58B | ₱3.10B | +₱1.52B |
Amounts are each office's total appropriation. They do not include Central Office projects built in the same area.
District offices: the ten largest and ten smallest
All 198 district engineering offices, ranked by their total appropriation in the House bill. Each figure is the office's own appropriation; it does not include Central Office projects built in the same area. "Proposed" is the NEP, "House" is HB 10858.
Ten largest
| District engineering office | Legislative district(s) | Proposed | House | Change |
|---|---|---|---|---|
| Ilocos Norte 1st | Ilocos Norte 1st | ₱0.41B | ₱4.79B | +₱4.38B |
| Nueva Ecija 1st | Nueva Ecija 1st and 2nd | ₱2.83B | ₱3.91B | +₱1.07B |
| Bulacan 2nd | Bulacan 4th; Bulacan 6th; City of San Jose del Monte (lone) | ₱3.45B | ₱3.50B | +₱0.05B |
| Isabela 4th | Isabela 4th and 6th | ₱1.58B | ₱3.10B | +₱1.52B |
| Metro Manila 3rd | Caloocan City 1st, 2nd and 3rd; Valenzuela City 1st and 2nd | ₱2.89B | ₱2.99B | +₱0.09B |
| Batangas 2nd | Batangas 2nd and 5th | ₱1.75B | ₱2.94B | +₱1.19B |
| Bulacan 1st | Bulacan 1st, 2nd and 5th | ₱2.35B | ₱2.66B | +₱0.31B |
| Cavite 1st | Cavite 1st, 3rd, 6th and 7th | ₱1.79B | ₱2.63B | +₱0.85B |
| Isabela 3rd | Isabela 2nd and 3rd | ₱1.53B | ₱2.52B | +₱0.99B |
| Isabela 1st | Isabela 1st | ₱1.33B | ₱2.41B | +₱1.08B |
Ten smallest
| District engineering office | Legislative district(s) | Proposed | House | Change |
|---|---|---|---|---|
| Davao City 3rd | Davao City 2nd | ₱0.04B | ₱0.04B | — |
| Davao City | Davao City 1st | ₱0.04B | ₱0.04B | — |
| Southern Leyte 2nd | Southern Leyte 2nd | ₱0.05B | ₱0.05B | — |
| Agusan del Sur 1st | Agusan del Sur 1st | ₱0.09B | ₱0.06B | −₱0.03B |
| Isabela City | Basilan (lone) | ₱0.07B | ₱0.07B | — |
| Southern Leyte 1st | Southern Leyte 1st | ₱0.17B | ₱0.09B | −₱0.08B |
| Ilocos Sur 1st | Ilocos Sur 1st | ₱0.10B | ₱0.10B | — |
| Bukidnon 3rd | Bukidnon 1st | ₱0.07B | ₱0.10B | +₱0.03B |
| Leyte 1st | Leyte 1st | ₱0.10B | ₱0.10B | — |
| Agusan del Norte | Agusan del Norte (lone) | ₱0.13B | ₱0.13B | — |
About these figures
Sources: FY2027 National Expenditure Program, Volume II-B, and House Bill No. 10858 (DPWH section and Volume I-C). Totals match each document's printed totals to the peso.
"New" means a project in the House bill with no counterpart in the NEP. Neither document shows who requested a project.
The proposal is a scanned document. Project names were matched by computer and checked against printed totals. A small share of matches may be imperfect; office totals are not affected.
A full itemized record of the ₱11.49 B DPWH amendment from the House BARSc hearing is in the BARSC 2027 record.