These are proposals, not yet final. The NEP is the President's proposal and House Bill No. 10858 the House's. The Senate and the bicameral conference can still change the bill, and it is not law until the 2027 General Appropriations Act is signed.
FY2027 budget · Department of Public Works and Highways

Every addition and cut in the House's DPWH budget

Every programme line whose appropriation changed between the President's proposal (the National Expenditure Program) and the House bill (HB 10858), in ₱ billion. Additions total +₱98.906B and cuts −₱87.416B, netting to the +₱11.490B change in the DPWH total.

← Back to the summary · Download the Word version

Summary (₱ billion)

₱B
Total additions (29 lines)+98.906
Total cuts (30 lines)−87.416
Net change in the DPWH budget+11.490

Additions (29 programme lines)

Programme lineNEPHouseChange
Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to support Social Services40.97583.707+42.732
Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads leading to Major/Strategic Public Buildings/Facilities105.725134.994+29.269
Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems62.98971.033+8.044
Preventive Maintenance - Secondary Roads11.67914.433+2.755
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads4.7346.588+1.854
Construction/Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collector Systems7.2998.868+1.569
Preventive Maintenance - Tertiary Roads5.7207.266+1.546
Construction of New Bridges4.5925.719+1.127
Preventive Maintenance - Primary Roads13.34314.396+1.052
Off-Carriageway Improvement - Secondary Roads1.9843.030+1.046
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads1.9542.886+0.932
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads4.8175.736+0.919
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads1.3802.227+0.847
Road Widening - Tertiary Roads1.6312.376+0.745
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads2.9323.575+0.643
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads0.1850.729+0.545
Road Widening - Secondary Roads10.36310.900+0.538
Road Widening - Primary Roads4.4764.837+0.361
Off-Carriageway Improvement - Primary Roads1.3141.656+0.343
Off-Carriageway Improvement - Tertiary Roads0.7421.078+0.336
Priority Bridges Crossing Pasig-Marikina and Manggahan Floodway Bridges Construction Project, under China Government Financing Facility0.0000.326+0.326
Metro Manila Bridges Project, ADB 4168-PHI0.0000.311+0.311
Basic Infrastructure Program (BIP) - Coastal Roads to Augment Resiliency of Coastal Communities1.3811.670+0.289
Basic Infrastructure Program (BIP) - Local Ports and Boat Landings0.4190.700+0.281
Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads18.33018.611+0.281
Road Network Development Project in Conflict-Affected Areas in Mindanao (RNDP-CAAM), JICA PH-F-P10.0000.115+0.115
Samal Island - Davao City Connector (SIDC) Project, China GCL no. 2022006007630.0000.055+0.055
Paving of Unpaved Roads - Tertiary Roads0.5400.569+0.029
Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads1.6511.669+0.017
Total, 29 lines311.154410.060+98.906

Cuts (30 programme lines)

Programme lineNEPHouseChange
Laguna Lakeshore Road Network (LLRN) Project - Phase I, KEDCF Loan No. PHL-27, ADB Loan No. 4523-PHI and AIIB Loan No. L0725A35.2108.210−27.000
Bataan-Cavite Interlink Bridge (BCIB) Project, ADB Loan No. 4432 - PHI and AIIB Loan No. L0724A22.4948.494−14.000
Cebu-Mactan Bridge (4th Bridge) and Coastal Road Construction Project, JICA Loan No. PH - P2748.5712.571−6.000
Pasig - Marikina River Channel Improvement Project (PMRCIP), Phase IV, JICA Loan Nos. PH-P271 and PH-P2838.5403.040−5.500
Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers20.85816.223−4.635
Mindanao Transport Connectivity Improvement Project, IBRD Loan No. 9775-PH5.2121.712−3.500
Davao City Bypass Construction Project (III) (South and Center Sections), Package I, JICA Loan No. PH-P2827.4203.920−3.500
Cavite Industrial Area Flood Risk Management Project (CIA-FRMP), JICA Loan Nos. PH-P265 and PH-P2846.5673.067−3.500
Payments of Right-of-Way (ROW)15.72413.108−2.617
Davao City Bypass Construction Project (II) (South and Center Sections), Package I, JICA Loan No. PH-P2734.3942.394−2.000
Metro Manila Priority Bridges Seismic Improvement Project (MMPBSIP) JICA Loan No. PH-P2602.8650.865−2.000
Widening of Permanent Bridges15.29113.493−1.798
Reconstruction and Development Plan for Greater Marawi, Stage 2, (Bangon Marawi Output 2), ADB Loan No. 3769-PHI2.8711.121−1.750
Construction of By-Pass and Diversion Roads46.45844.786−1.672
Integrated Flood Resilience and Adaptation 1 (InFRA I) Project, ADB Loan No. 4345-PHI3.0811.581−1.500
Construction of Missing Links/New Roads23.91222.661−1.251
Accelerated Bridge Construction Project for Greater Economic Mobility and Calamity Response, Proposed for French ODA1.7650.958−0.807
Improving Growth Corridors in Mindanao Road Sector Project (IGCMRSP), ADB Loan No. 3631-PHI2.1131.363−0.750
Samar Pacific Coastal Road II Project (Laoang II Bridge and Calomotan Bridge), KEDCF Loan No. PHL-261.4600.710−0.750
Buildings and Other Structures - Multipurpose / Facilities - National Building Program13.43412.876−0.558
Dalton Pass East Alignment Road Project, JICA Loan No. PH - P2801.0540.554−0.500
Infrastructure Preparation and Innovation Facility (IPIF), 2nd Additional Financing Output 1: Roads and Bridges, ADB Loan No. 4424 - PHI1.0580.558−0.500
Replacement of Permanent Weak Bridges12.03011.691−0.340
Infrastructure Preparation and Innovation Facility (IPIF), 2nd Additional Financing, Output 2; Water Projects, ADB Loan No. 4424 - PHI1.1490.899−0.250
Construction of Flyovers/Interchanges/ Underpasses/Long Span Bridges0.7350.515−0.220
Replacement of Bridges ( Temporary to Permanent )0.2000.000−0.200
Retrofitting/Strengthening of Permanent Bridges3.0072.842−0.165
Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Primary Roads1.6931.604−0.089
Pre-Feasibility Study/Feasibility Study/Preliminary and Detailed Engineering10.57810.533−0.045
Rehabilitation/Major Repair of Permanent Bridges3.8673.845−0.021
Total, 30 lines283.611196.194−87.416

National Expenditure Program (Volume II-B) vs. House Bill No. 10858. Each row is one programme line; the NEP and House figures are that line's appropriation and the change is House minus NEP. Lines whose appropriation did not change are omitted. Totals match each document's printed totals to the peso.

A negative figure is a cut. "Payments of Right-of-Way" and the road- and bridge-maintenance lines sit under Support to Operations and the asset-preservation programme respectively.