FY2027 budget · Department of Public Works and Highways
Every addition and cut in the House's DPWH budget
Every programme line whose appropriation changed between the President's proposal (the National Expenditure Program) and the House bill (HB 10858), in ₱ billion. Additions total +₱98.906B and cuts −₱87.416B, netting to the +₱11.490B change in the DPWH total.
Summary (₱ billion)
| ₱B | |
|---|---|
| Total additions (29 lines) | +98.906 |
| Total cuts (30 lines) | −87.416 |
| Net change in the DPWH budget | +11.490 |
Additions (29 programme lines)
| Programme line | NEP | House | Change |
|---|---|---|---|
| Basic Infrastructure Program (BIP) - Multi-Purpose Buildings/Facilities to support Social Services | 40.975 | 83.707 | +42.732 |
| Basic Infrastructure Program (BIP) - Access Roads and/or Bridges from the National Roads leading to Major/Strategic Public Buildings/Facilities | 105.725 | 134.994 | +29.269 |
| Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems | 62.989 | 71.033 | +8.044 |
| Preventive Maintenance - Secondary Roads | 11.679 | 14.433 | +2.755 |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Secondary Roads | 4.734 | 6.588 | +1.854 |
| Construction/Rehabilitation of Water Supply/ Septage and Sewerage/ Rain Water Collector Systems | 7.299 | 8.868 | +1.569 |
| Preventive Maintenance - Tertiary Roads | 5.720 | 7.266 | +1.546 |
| Construction of New Bridges | 4.592 | 5.719 | +1.127 |
| Preventive Maintenance - Primary Roads | 13.343 | 14.396 | +1.052 |
| Off-Carriageway Improvement - Secondary Roads | 1.984 | 3.030 | +1.046 |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Tertiary Roads | 1.954 | 2.886 | +0.932 |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Secondary Roads | 4.817 | 5.736 | +0.919 |
| Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Secondary Roads | 1.380 | 2.227 | +0.847 |
| Road Widening - Tertiary Roads | 1.631 | 2.376 | +0.745 |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Tertiary Roads | 2.932 | 3.575 | +0.643 |
| Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Tertiary Roads | 0.185 | 0.729 | +0.545 |
| Road Widening - Secondary Roads | 10.363 | 10.900 | +0.538 |
| Road Widening - Primary Roads | 4.476 | 4.837 | +0.361 |
| Off-Carriageway Improvement - Primary Roads | 1.314 | 1.656 | +0.343 |
| Off-Carriageway Improvement - Tertiary Roads | 0.742 | 1.078 | +0.336 |
| Priority Bridges Crossing Pasig-Marikina and Manggahan Floodway Bridges Construction Project, under China Government Financing Facility | 0.000 | 0.326 | +0.326 |
| Metro Manila Bridges Project, ADB 4168-PHI | 0.000 | 0.311 | +0.311 |
| Basic Infrastructure Program (BIP) - Coastal Roads to Augment Resiliency of Coastal Communities | 1.381 | 1.670 | +0.289 |
| Basic Infrastructure Program (BIP) - Local Ports and Boat Landings | 0.419 | 0.700 | +0.281 |
| Rehabilitation/ Reconstruction/ Upgrading of Damaged Paved Roads - Primary Roads | 18.330 | 18.611 | +0.281 |
| Road Network Development Project in Conflict-Affected Areas in Mindanao (RNDP-CAAM), JICA PH-F-P1 | 0.000 | 0.115 | +0.115 |
| Samal Island - Davao City Connector (SIDC) Project, China GCL no. 202200600763 | 0.000 | 0.055 | +0.055 |
| Paving of Unpaved Roads - Tertiary Roads | 0.540 | 0.569 | +0.029 |
| Construction/ Upgrading/ Rehabilitation of Drainage along National Roads - Primary Roads | 1.651 | 1.669 | +0.017 |
| Total, 29 lines | 311.154 | 410.060 | +98.906 |
Cuts (30 programme lines)
| Programme line | NEP | House | Change |
|---|---|---|---|
| Laguna Lakeshore Road Network (LLRN) Project - Phase I, KEDCF Loan No. PHL-27, ADB Loan No. 4523-PHI and AIIB Loan No. L0725A | 35.210 | 8.210 | −27.000 |
| Bataan-Cavite Interlink Bridge (BCIB) Project, ADB Loan No. 4432 - PHI and AIIB Loan No. L0724A | 22.494 | 8.494 | −14.000 |
| Cebu-Mactan Bridge (4th Bridge) and Coastal Road Construction Project, JICA Loan No. PH - P274 | 8.571 | 2.571 | −6.000 |
| Pasig - Marikina River Channel Improvement Project (PMRCIP), Phase IV, JICA Loan Nos. PH-P271 and PH-P283 | 8.540 | 3.040 | −5.500 |
| Construction/ Rehabilitation of Flood Mitigation Facilities within Major River Basins and Principal Rivers | 20.858 | 16.223 | −4.635 |
| Mindanao Transport Connectivity Improvement Project, IBRD Loan No. 9775-PH | 5.212 | 1.712 | −3.500 |
| Davao City Bypass Construction Project (III) (South and Center Sections), Package I, JICA Loan No. PH-P282 | 7.420 | 3.920 | −3.500 |
| Cavite Industrial Area Flood Risk Management Project (CIA-FRMP), JICA Loan Nos. PH-P265 and PH-P284 | 6.567 | 3.067 | −3.500 |
| Payments of Right-of-Way (ROW) | 15.724 | 13.108 | −2.617 |
| Davao City Bypass Construction Project (II) (South and Center Sections), Package I, JICA Loan No. PH-P273 | 4.394 | 2.394 | −2.000 |
| Metro Manila Priority Bridges Seismic Improvement Project (MMPBSIP) JICA Loan No. PH-P260 | 2.865 | 0.865 | −2.000 |
| Widening of Permanent Bridges | 15.291 | 13.493 | −1.798 |
| Reconstruction and Development Plan for Greater Marawi, Stage 2, (Bangon Marawi Output 2), ADB Loan No. 3769-PHI | 2.871 | 1.121 | −1.750 |
| Construction of By-Pass and Diversion Roads | 46.458 | 44.786 | −1.672 |
| Integrated Flood Resilience and Adaptation 1 (InFRA I) Project, ADB Loan No. 4345-PHI | 3.081 | 1.581 | −1.500 |
| Construction of Missing Links/New Roads | 23.912 | 22.661 | −1.251 |
| Accelerated Bridge Construction Project for Greater Economic Mobility and Calamity Response, Proposed for French ODA | 1.765 | 0.958 | −0.807 |
| Improving Growth Corridors in Mindanao Road Sector Project (IGCMRSP), ADB Loan No. 3631-PHI | 2.113 | 1.363 | −0.750 |
| Samar Pacific Coastal Road II Project (Laoang II Bridge and Calomotan Bridge), KEDCF Loan No. PHL-26 | 1.460 | 0.710 | −0.750 |
| Buildings and Other Structures - Multipurpose / Facilities - National Building Program | 13.434 | 12.876 | −0.558 |
| Dalton Pass East Alignment Road Project, JICA Loan No. PH - P280 | 1.054 | 0.554 | −0.500 |
| Infrastructure Preparation and Innovation Facility (IPIF), 2nd Additional Financing Output 1: Roads and Bridges, ADB Loan No. 4424 - PHI | 1.058 | 0.558 | −0.500 |
| Replacement of Permanent Weak Bridges | 12.030 | 11.691 | −0.340 |
| Infrastructure Preparation and Innovation Facility (IPIF), 2nd Additional Financing, Output 2; Water Projects, ADB Loan No. 4424 - PHI | 1.149 | 0.899 | −0.250 |
| Construction of Flyovers/Interchanges/ Underpasses/Long Span Bridges | 0.735 | 0.515 | −0.220 |
| Replacement of Bridges ( Temporary to Permanent ) | 0.200 | 0.000 | −0.200 |
| Retrofitting/Strengthening of Permanent Bridges | 3.007 | 2.842 | −0.165 |
| Rehabilitation/ Reconstruction of Roads with Slips, Slope Collapse and Landslide - Primary Roads | 1.693 | 1.604 | −0.089 |
| Pre-Feasibility Study/Feasibility Study/Preliminary and Detailed Engineering | 10.578 | 10.533 | −0.045 |
| Rehabilitation/Major Repair of Permanent Bridges | 3.867 | 3.845 | −0.021 |
| Total, 30 lines | 283.611 | 196.194 | −87.416 |
National Expenditure Program (Volume II-B) vs. House Bill No. 10858. Each row is one programme line; the NEP and House figures are that line's appropriation and the change is House minus NEP. Lines whose appropriation did not change are omitted. Totals match each document's printed totals to the peso.
A negative figure is a cut. "Payments of Right-of-Way" and the road- and bridge-maintenance lines sit under Support to Operations and the asset-preservation programme respectively.